How much does an inspection cost?
The permit fee covers the annual routine inspection and one follow-up inspection. The annual fee is based upon the number of underground tanks that are installed at each facility. If additional inspections are required, an hourly fee may be applied (this fee will be billed separately from the annual fee). Fees for other CUPA programs, such as Hazardous Waste Generator, Hazardous Materials Disclosure, etc. will appear on the annual bill.
Click here for the current fee schedule.
|