header-cupa-ust

Google Search

Page Translation

Contact Us

Environmental Health
1241 East Dyer Road
Suite 120
Santa Ana, CA 92705
Voice (714)433-6000
Fax (714) 433-6423
Map

UST FAQ 15

What testing do I need to have done?

  • The UST monitoring system and spill buckets must be tested annually
  • For UST systems that are not programmed for positive shutdown and fail-safe, an annual pipeline integrity test is required
  • For tanks installed prior to July 1, 2003, secondary containment testing (SB 989) is required every 36 months
  • Underground tanks with single-walled components or unique circumstances may require additional testing. Please contact your inspector for guidance

Underground Storage Tank System Testing Intervals

UST System Testing Required Testing Interval
Annually Every 3 Years Following Modifications to Component If Applicable
Monitor System Certification X   X  
Leak Detector X   X  
Spill Bucket X   X  
Secondary Containment1   X X  
Tank Integrity       X2
Pipeline Integrity X3      

1Not required on VPH systems.
2Only required for single-walled tanks. Interval depends on monitoring plan.
3For single-walled piping or systems not programmed for positive shutdown and fail safe.